欧美激情另类自拍_久久精品一本无码免费_男人天堂网在线视频_2024最新高清电影_大香伊蕉最新视频国产_av免费观看一区二区三区_激情在线播放亚洲_日本天天日噜噜噜_免费看高清黄色大片_亚洲精品无码A∨网美利坚

大連注塑成型
Your current location : Home >>  news >> Industry news

Contact UsContact Us

Dalian Jinghe Molding Co., Ltd

Dalian Chenghua plastic products Co., Ltd

Tel:0411-87840676

Fax:0411-87840576

Web:ssalogistics.cn/en

E-mail:office@dlchenghua.cn

              office@dljinghe.com

Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian

What should we pay attention to when plastic injection molding

release date:2021-07-22 00:00 source: http://ssalogistics.cn Click:

Drying process of transparent plastics: material process drying temperature (℃) drying time (H) material layer thickness (mm) remarks pmma70 ~ 802 ~ 430 ~ 40pc120 ~ 130 > 6 < 30 hot air circulation drying pet140 ~ 1803 ~ 4 continuous drying feeding device is preferred.


Cleaning of barrel, screw and its accessories in order to prevent raw material pollution and the existence of old materials or impurities in the depression of screw and accessories, especially the existence of resin with poor thermal stability, screw cleaning agent shall be used to clean all parts before use and after shutdown, so that there shall be no impurities. When there is no screw cleaning agent, PE, PS and other resins can be used to clean the screw.


In case of temporary shutdown, in order to prevent the degradation of raw materials due to long residence time at high temperature, the temperature of dryer and barrel should be reduced, such as PC, PMMA and other barrel temperatures should be reduced below 160 ℃. (the hopper temperature shall be reduced below 100 ℃ for PC).


Dalian injection molding


Due to the high transmittance of transparent plastics, the surface quality of plastic products must be strict, and there shall be no spots, pores and whitening. Fog halo, black spots, discoloration, poor gloss and other defects, so the raw materials and equipment are damaged in the whole injection molding process in Dalian. Mold and even product design should pay great attention to and put forward strict or even special requirements.


Secondly, because most transparent plastics have high melting point and poor fluidity, in order to ensure the surface quality of products, it is often necessary to make subtle adjustments to the process parameters such as high temperature, injection pressure and injection speed, so that the mold can be filled during injection without internal stress causing product deformation and cracking. Therefore, strict operation should be carried out in terms of raw material preparation, equipment and mold requirements, injection molding process and raw material treatment of products.


Related tags:

  • Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
    Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
  • E-mail:office@dlchenghua.cn
    E-mail:office@dlchenghua.cn
  • Tel:0411-87840676
    Tel:0411-87840676
Professional production enterprise engaged in plastic injection molding, extrusion and blow molding

1637907000586125.png

Wechat        Mobile

Dalian Chenghua plastic products Co., Ltd

Dalian Jinghe Molding Co., Ltd